---MAIN BATHROOM---
UPSTAIRS

Vanity and new sink installed in 2007.


The floor is linoleum in this bathroom

New shower head installed in 2008
--HALF BATH---MAIN LEVEL---

New over the toilet cupboard installed in 2008.
This is included with the townhome.

The floor is vinyl tile in this bathroom.
No comments:
Post a Comment